CR 4851 West rolls through Port Interlocking, passing the eastbound air-operated switch to the Columbia & Port Deposit Branch. The 4851 was built in June, 1935. Photo date is approximate.
Conrail GG-1's 4851-4859, is south bound with train VW-1, at South Brunswick, NJ. 10/22/1977